Functional control of the signalling system at Oslo S for Infranord

Infranord Norge AS will build the Infrastructure for the entrance of the new Follo Line on Oslo S. The contract is an EPC contract and covers all railway technical disciplines.

Infranord has signed an agreement with ProRail on total responsibility for the planning and execution of the functional control for the included rebuild of the signalling system at Oslo Central station (Oslo S). The assignment will be performed by Bane NOR certified testers (“Sluttkontrollør F”).

We thank Infranord for the continued confidence in us. We are looking forward to a very challenging assignment that is scheduled to last until 30.08.2022!