Sub Project Management; upgrade of class-B signalling systems


Sub Project Managemen for upgrade of Thales class-B signalling systems on behalf of Bane NOR. The Project scope is to upgrade the SW; and in some cases HW; on alreade commissioned lines. ProRail scope is to be the Project Manager's advisor for signalling issues and responsibility for project documentation and functional studies. Part of the scope is to assist other activities and evaluation of fullfilment of the technical requirements in addition to participate during approval activitites and test and commissioning activities.
Start date: 01/2019  Ongoing
Client: Bane NOR SF
 

Quotation for signalling works Kvam station; Dovrebanen


Participation in the bid team for the total delivery of rebuild of Kvam station. ProRail scope was the signalling part of the bid.
Start date: 11/2018  Ongoing
Client: Infranord Norge AS
 

Detailed signalling engineering; Holmen freight terminal.


Engineering management; engineering and quality controll of new signalling system for Holmen freight terminal. The engineering works are done according to Bane NOR signalling processes.
Start date: 11/2018  Ongoing
Client: Multiconsult AS
 

"Grensebane"-project Sporveien


The assignment was to assist Multiconsult with signalling personnel during engineering of the project.
Start date: 09/2018  Ongoing
Client: Multiconsult AS
 

Signalling engineering; Rudshøgda timber terminal


ProRail scope was to present possible solutions for a new freight terminal for timber on Rudshøgda stastion and engineering management and engineering of the necessary signalling works. The engineering was done according to Bane NOR signalling processes.
Start date: 09/2018  Ongoing
Client: Multiconsult AS
 

Sub project manager; Norwegian ERTMS Programme


Sub project management for establishing the ERTMS Test lab for the Norwegian ERTMS Programme; on behalf of Bane NOR. The test lab will be the joint lab for integration testing of trackside; TMS and onboard systems and the Bane NOR delivered GSM-R; transmission and OAM-systems. In addition the test lab will be used during GA/SA acceptance tests and other testing as required. The ProRail AS scope is to manage the development; integration and installation of the test lab. Part of the scope will also be testing of the functionality and operation of the lab equipment during the first test phases after commissioning of the lab. After commissioning of the lab; the role will be ERTMS Test lab facility manager / ESC Test facility manager for the rollout Project. As part of the assignment ProRail AS also participates during the ERTMS Test line; full scale operational tests; test strategies; review of test plans and test cases and development of the technical and operational training centre.
Start date: 06/2018  Ongoing
Client: Bane NOR SF
 

Signalling engineering; Hauerseter freight terminal


The scope of the project is to present possible solutions for establishing a freight terminal for timber and mixed transport on Hauerseter station on the Hovedbanen line. ProRail AS scope is complete management and engineering of the signalling part of the project. The engineering will be done according to the Norwegian signalling engineering process from Bane NOR.
Start date: 05/2018  Ongoing
Client: Multiconsult AS
 

Signalling Oslo S; EPC Railway Systems Follobanen


InfraNord Norge won the Railway System contract for Oslo S with the scope to engineer; install; test and commission all permanent adaptions of Oslo Central station for the new Follobanen double track line. Track works; catenary; telecom; low voltage; high voltage and signalling systems are included in the scope. ProRail AS scope is engineering of the signalling system for procurement and installation; project and site management for the signalling subproject; sub-contracting of installation contractors; installation check out and function control of the signalling system. The NSB-77 relay interlocking will be modified and will border the new Thales class-B interlocking at the new entry signal for Oslo S in the new Follobanen tunnel. The project scope will be commissioned during several phases; ending in 2022 with commissioning of the complete Follobanen line. The project requires high capacity of personnel with signalling certifications from Bane NOR.
Start date: 01/2018  Ongoing
Client: Infranord Norge AS
 

Site management Thales; Ski station and Follobanen


Site management on behalf of Thales during installation of the new class-B signalling system as part of the SignAn frame agreement. First phase was a rebuild of the NSI-63 relay interlocking at Ski station. Second phase is installation of the new computer based Thales interlocking on Ski station. Third phase is installation of the new Thales interlocking on the new double track Follobanen line; with planned commissioning in 2022. Follow up of installation contractors NJD AS and NRC Rail AS; planning; clarifications and coordination towards Bane NOR and the other contractors are main focus areas. The ProRail AS scope also includes sample based installation check out.
Start date: 04/2017  Ongoing
Client: Thales Norway AS
 

Verification of signalling engineering Moss station


The overall project scope was to engineer the total rebuild of Moss station on the Østfoldbanen eastern line; as part of the Intercity project Moss-Såstad; including engineering of centralized traffic control. ProRail AS scope was to do quality control and approval of the signalling drawings according to the Norwegian signalling engineering process and to provide technical support for Norwegian requirements to Danish signalling engineers.
Start date: 01/2017  Ongoing
Client: Rambøll Norge AS
 

Cable survey; Drammen-Kobbervik


Survey and registration of all cables on Drammen station and the Drammen-Kobbervik section on the Vestfoldbanen line. Production of documentation of cable troughings and cable lists. Coordination towards contractors during ongoing modifications of Drammen station.
Start date: 06/2016  Ongoing
Client: ECT AS
 

Engineering manager and Project Engineer; signalling projects


Signalling Engineering manager and Project Engineer working as part of the COWI engineering organization; with focus on Norwegian technical requirements and the Norwegian signalling engineering process; since main part of the engineering was done by Danish signalling engineers. Included engineering for the new double track section Arna-Bergen on the Bergensbanen line; and the new double track Intercity sections Haug-Fredrikstad and Sarpsborg-Halden on the Østfoldbanen western line. The scope also included engineering of a temporary interlocking for Bergen station.
Start date: 02/2016  Ongoing
Client: COWI AS
 

Engineering manager signalling; IC Nykirke-Barkåker


Engineering manager for engineering of the initial signalling plan for the ERTMS-installation on the Intercity project Nykirke-Barkåker; a new double track section of the Vestfoldbanen line. Included following the complete Jernbaneverket signalling process. After completing the main scope; temporary points for construction work was included in the scope as temporary changes in the existing NSI-63 relay interlocking.
Start date: 01/2015  Ongoing
Client: ECT AS
 

Engineering management signalling; IC Venjar-Sørli


Engineering management and approval of drawings for engineering of the detailed signalling plan for the class-B system on the Intercity project Venjar-Sørli; a new double track section of the Dovrebanen line. Included following the complete Jernbaneverket signalling process. Also included complete engineering of the modified ATC-system on the Siemens signalling system on Eidsvoll station; a part of the Gardermobanen line.
Start date: 01/2015  Ongoing
Client: ECT AS
 

Site manager signalling Drammen-Kobbervikdalen


Site management for the signalling system on new double track lines Drammen-Kobbervikdalen and Drammen-Gulskogen. Including rebuild og Drammen and Gulskogen stations. The assignment scope is: - Assist with making RFQ for the installation of the signalling system. Follow up the project phase planning. - Oversee and supervise the installation work done by the signalling contractor - Supervise the document flow and document quality for all phases of the project - Supervise and monitor the quality of the test and commissioning activities following the installation both for outdoor and indoor parts of the system - Optimize the installation to ease installation and commissioning of ERTMS Signalling system in 2024
Start date: 06/2019 - End date: 12/2025
Client: Bane NOR SF
 

Test of level crossing indications; Ganddal godsterminal


Installation; post installation check out and test of curcuits for status indication of the level crossings on Ganddal freight terminal in the VICOS TMS/CTC-system. The activities were performed with personnel certified by Bane NOR as "Sikkerhetskontrollør signal" og "Sluttkontrollør F".
Start date: 01/2018 - End date: 11/2018
Client: Bane NOR SF
 

Track replacement "Solørbanen"


The project scope was to replace sleepers and rails on parts of "Solørbanen". The ProRail scope was to plan and supervise the sub-contractor activities related to existing signalling installations and necessary documentation of the signalling works.
Start date: 08/2018 - End date: 01/2018
Client: Infranord Norge AS
 

Site Manager nationwide modifications of the ATC-system


Site management on behalf of Jernbaneverket for the nationwide modifications of the Norwegian legacy ATP-system ATC ("Kryssingbarriere"). The scope of work also included participation during several shutdowns all over Norway and function control of the affected signalling systems. Follow up of multiple installation contractors were a daily part of the project. Also some engineering tasks were included during periods with lack of resources within the client organization.
Start date: 08/2014 - End date: 07/2018
Client: Jernbaneverket Signaltjenester
 

Test and commissioning of level crossing signals; Ganddal freigth terminal


The assignment scope was post installation check out; test and commissioning of level crossing signals for Orstad freight terminal. The installation work was done by other company in 2017. The activities were performed with personnel certified by Bane NOR as "Sikkerhetskontrollør signal" og "Sluttkontrollør F".
Start date: 06/2018 - End date: 07/2018
Client: Bane NOR SF
 

ERTMS support team ØØL


ERTMS on call support service as part of the Jernbaneverket 1. and 2. line signalling support for the ERTMS installations on Østfoldbanen Østre linje the first year after commissioning of the Norwegian ERTMS Pilot. Included telephone support during failures of the system and also on site emergency repair services during more severe failures. Part of the scope was to represent Bombardier during maintenance follow up meetings and user group meetings with train operator personnel and dispatchers. In 2018 the scope included development and execution of 3 training courses in the Bombardier Interflo 450 system for signalling personnel from Jernbaneverket; both signalling technicians; test leaders and system responsible's.
Start date: 09/2015 - End date: 04/2018
Client: Bombardier Transportation Sweden AB
 

Feasibility study; Freight hub for the Trondheim area


The project was a feasibility study of possible adaptions of the NSI-63 relay interlocking on Trondheim station on the Dovrebanen line; for establishing a terminal which could serve as a freight hub for the entire region. Main focus area was necessary modifications of the signalling system for achieving 600m. train length. The conclusion was quickly found that no issues for the signalling system could be identified.
Start date: 04/2018 - End date: 04/2018
Client: Multiconsult AS
 

Norwegian ERTMS-pilot Østfoldbanen Østre linje


The overall project scope was to establish the first ERTMS-line in Norway on behalf of Jernbaneverket; including a completely new signalling system; traffic management system; adaption of operational rules; maintenance preparations and training. ProRail AS scope was project management from contract award until the approval of the SRS; including Norwegian functionality (December 2012). After JBV approval of the SRS; the scope was project management responsibility for all activities in Norway and necessary participation in the activities; i.e.: Complete site management scope; follow up of installation sub-contractor NJD AS; part of the test teams doing start-up and function control of the sub-systems; commissioning responsibility for the axle counter system and the hand held terminal system; establishing maintenance requirements; safety responsibility and test leader onboard for all test and commissioning activities on site. After commissioning in August 2015; the ProRail AS scope was follow up of system performance and issues; establishing operational work arounds and participation in installation; test and commissioning of updates of the system with Jernbaneverket approved "Sluttkontrollør F".
Start date: 01/1970 - End date: 04/2018
Client: Bombardier Transportation Sweden AB
 

Reference Sheet Norwegian ERTMSpilot line Østfoldbanen Østre Linje


Østfoldbanen Østre Linje (ØØL) is an 80 km. long line through the inner parts of Østfold, from Ski to Sarpsborg. The Project was responsible for implementing the new European signalling system ERTMS for the first time in Norway. The ERTMS system on ØØL was commissioned in August 2015. The project comprised:
  • Establishment and testing of new traffic safety regulations for ERTMS lines
  • Rebuilding and upgrading of 5 stations
  • Engineering and installation of new ERTMS signalling systems at 7 stations, 17 level crossings and automatic level transition on 2 adjacent stations
  • Training of technical and operational personnel
  • Technical and operational testing of the system with ERTMS-equipped trains
prorail AS Contribution in the project (April 2011- march 2018) Bombardier Transportation RCS AB signed a contract with Jernbaneverket (now Bane NOR) on total system responsibility for design, engineering, installation, testing and commissioning of the new ERTMS system. ProRail AS was subcontracted by Bombardier already in the bid phase and contributed with the following:
  • Responsibility for installation and contract execution during the bid phase and contract negotiations with customer.
  • Project management on behalf of Bombardier from contract award to customer acceptance of the SRS. This phase included the establishment of administrative routines, system design, engineering of the system and start-up of the installation.
  • Project management and site management for the activities in Norway following customer acceptance of the SRS. This phase included installation, testing, commissioning, operational testing, training, establishment of the maintenance organization, establishment of spare part storage, training, following up of operational status of the system after commissioning.
  • On board test and safety responsibility for all test train activities: Training of drivers, type testing of OBU’s, trackside commissioning, full scale operational test, presentation and marketing etc. adding up to 120 days of test train activities.
  • Test and commissioning of various ERTMS subsystems with personnel authorizes as “sluttkontrollør F” for the ERTMS system.
  • Participation in ERTMS support team together with customer after commissioning – On call duty, troubleshooting, error correction and customer support.
  • Preparation and execution of rehearsal courses for customer signalling personnel (“sikkerhetskontrollør”, “sluttkontrollør F” and system specialists).
  ReferENCES References and further information are available on request: www.prorail.no / post@prorail.no / phone: (+47) 950 49 553.
Start date: 11/2011 - End date: 04/2018
 

Site manager signalling SSG Sandnes-Stavanger


Site management on behalf of Jernbaneverket on resignalling of the section Sandnes-Stavanger/Ganddal freight terminal on the line Sørlandsbanen. The project was the first deployment line in the Norwegian class-B signalling frame agreement SignAn. Scope of work included follow up of signalling system supplier Thales AS and installation subcontractor Eltel Networks AS. In addition the scope included engineering management and sub-project management of railway systems contractor InfraNord AS for the necessary updates of other railway systems (i.e. tracks; catenary; point heating). In some of the project phases also installation check-out and function control was included both of the new signalling system and the legacy NSI-63 relay interlocking. The work was done by personnel with Jernbaneverket signalling certifications.
Start date: 04/2012 - End date: 03/2018
Client: Jernbaneverket Utbygging
 

Tender for the Norwegian National Implementation of ERTMS


Part of Bombardier Transportation core bid team during the tender process and negotiations with Bane NOR for the Norwegian National Implementation of ERTMS. ProRail AS was responsible for the roll-out planning; installation; migration and test part of the trackside tender. Participated also in the track-side commissioning part and in the training part of both trackside and onboard. Important focus areas were lessons learned from the Norwegian ERTMS Pilot; logistics for deliveries to installation subcontractors; negotiations with installation subcontractors and electronic system for follow up of installation check lists; test records and related documentation.
Start date: 11/2015 - End date: 03/2018
Client: Bombardier Transportation AB
 

Reference Sheet SignAn, SSG Sandnes - Stavanger


SSG Sandnes – Stavanger was the first work order of the Norwegian signalling frame agreement for electronic class-B interlockings - SignAn. Scope of the Project was to commission a new interlocking for the (Klepp) – Stavanger section of the Sørlands-banen line. The Project also had the responsibility to get the new IL approved internally and by the Norwegian Railway Authority (“Statens Jernbanetilsyn”). The project comprised.:
  • Responsible for follow-up of supplier for Generic Approval of Thales IL ESTW L90 5.
  • Installation and commissioning of Thales IL (Interlocking) at Ganddal Freight Terminal
  • Installation and commissioning of Thales IL at 5 stations and 4 block posts.
  • Finalize the adaptions of other railway systems necessary for the commissioning (i.e. track works, catenary works, low voltage works).
  • Training of technical and operational personnel
  prorail AS Contribution in the project (may 2012- march 2018): Thales signed a contract with Jernbaneverket (now Bane NOR) on total system responsibility for design, engineering, installation, testing and commissioning of the new IL. ProRail contributed with the following:
  • Planning and follow-up installation and adaption of cable routes.
  • Daily follow-up of Thales and their installation subcontractor’s.
  • Responsibility for follow up of engineering of track and catenary systems on the double track section Sandnes – Stavanger.
  • Participated in several analyzes, workshops and clarifying meetings with Thales according to generic approval.
  • Participation in several analyzes, workshops and clarifying meetings with Technology, Traffic department etc. in connection with generic and specific approval.
  • Follow-up tests done by Thales on site. This includes installation control, Pre-test and pre-SAT.
  • Participation during commissioning tests, SAT.
  ReferENCES References and further information are available on request: www.prorail.no / post@prorail.no / phone: (+47) 480 75 453.
Start date: 04/2012 - End date: 03/2018
 

Commissioning of renewed track sections Oslo S


Function control and commissioning of 22 new track fields; cables and 7 outdoor cabinets as part of the renewal of track sections Project. The objects was part of the NSB-77 relay interlocking on Oslo Central station and the work was done by personnel certified by Bane NOR as "Sluttkontrollør F" during night and weekend shutdowns of Oslo S.
Start date: 08/2017 - End date: 01/2017
Client: Eltel Networks AS
 

Ombygging Orstad sidespor og klepp


Installation; post installation check out and test of temporary changes in existing signalling installation during SAT of new class-B signalling system for the double track line Sandnes-Stavanger. The activities were performed in two phases by personnel approved by Bane NOR as "Sikkerhetskontrollør signal" and "Sluttkontrollør F".
Start date: 06/2017 - End date: 09/2017
Client: Infranord Norge AS
 

Function control; signalling Oslo S; RIV-RE Follobanen


The overall project scope was to modify eastern parts of the Oslo central station enabling building of the new Follobanen line. ProRail AS scope was to do function control on the affected trackside signalling objects for the NSB-77 relay interlocking. The work was done by personnel certified by Bane NOR as "Sluttkontrollør F" during summer shutdowns.
Start date: 07/2017 - End date: 07/2017
Client: Baneservice AS
 

Site management Follobanen Oslo S


Site management of the signalling part of the project modifying Oslo Central station as preparations for building of the Follobanen line (RIV-RE). Follow up of contractor Baneservice AS on behalf of Jernbaneverket. Follow up on deliveries of engineering documents. Included modifications of the NSB-77 relay interlocking and trackside objects.
Start date: 06/2014 - End date: 05/2017
Client: Jernbaneverket Signaltjenester
 

Site and engineering management; signalling UHN Holm-Nykirke


Site management and project engineer on behalf of Jernbaneverket on signalling of the new double track section on the Vestfoldbanen line between Holm and Nykirke. The project was part of the Norwegian class-B signalling frame agreement SignAn. Scope of work included follow up of signalling system supplier Thales AS and installation subcontractors. The scope also included follow up of Bombardier Transportation during modifications of the existing EBILock interlocking; including subcontractor NJD AS. Installation check out and function control during some phases in the project was also part of the scope. All work was done by personnel certified by Jernbaneverket as "Sluttkontrollør F".
Start date: 01/2014 - End date: 05/2017
Client: Jernbaneverket Signaltjenester
 

Reference Sheet UHN Holm - Nykirke


On the Vestfoldbanen line, Jernbaneverket built a new double track section between Holm and Nykirke. In the northern part, there was an interface to the existing double track section on Sande, and in the south the new line ended on Nykirke station with interface towards single track towards Tønsberg. Total length of the new double track was 14.2 km. A total of 12.4 km. of the line was built in a tunnel comprising Holmestrand station and adjacent line sections. The signalling system for the new section was delivered by Thales - ESTW L90 5, a class-B Interlocking with optical signals. The scope included necessary modifications on the Ebilock-950 Interlocking from Bombardier on the existing Sande part of the line. The new double track section was commissioned in November 2016.   prorail AS Contribution in the project (jan. 2014-MaY 2017): Site Manager, signalling:
  • Planning and follow-up installation and adaption of cable routes
  • Daily follow-up of Thales and their installation subcontractors
  • Follow-up of Bombardier and their installation subcontractors during modifications of existing IL, Ebilock 950
  • Responsible for construction meetings
  • Development of control plan and follow up on this
  • Installation Control of all signalling installations
  • Coordination with other railway system contractors (track, catenary etc.)
  • Follow-up installation control done by Thales and Bombardier
  • Participation during commissioning, SAT
  Engineering manager / Project Engineer, signalling:
  • Assistance to Project Manager, Project Manager for Engineering and Project Manager for RAMS with technical support
  • Engineering and approval of signal drawings
  • Technical meetings with Thales and Bombardier
  • Acceptance check of document deliveries from Thales and Bombardier
  • Keep track of changes and current revisions of drawings and documents
  • Change control of variations from Bombardier and Thales against internal authorities
  • Assistance to Site Manager with drawings and documentation.
  • Participation during commissioning, SAT
    ReferENCES References and further information are available on request: www.prorail.no / post@prorail.no / phone: (+47) 480 75 453.
Start date: 01/2014 - End date: 05/2017
 

Engineering of signalling system; Østensjøbanen metro line


Subcontract for engineering of the signalling system for rebuild of the Oslo metro line Østensjøbanen. Follow up of the installation phase and production of as-built and maintenance documentation for end client KTPAS.
Start date: 06/2014 - End date: 02/2017
Client: ECT AS
 

Function control signalling; FATC Jessheim-Eidsvoll


The overall project scope was to rebuild the signalling system on 5 stations on the Hovedbanen line; and modify the ATC system from DATC to FATC on the entire section of the line. ProRail AS scope was quality audit of the signalling contractor; site management and error correction during a 10 day shutdown of the line and complete function control of the 5 NSI-63 relay interlockings/ATP-system and adjacent line block sections. The work was done by personnel certified by Bane NOR as "Sluttkontrollør F".
Start date: 09/2016 - End date: 12/2016
Client: Infranord Norge AS
 

Engineering; signalling Bergen-Fløen


Quality control and approval of signalling drawings for building of the new double track section Bergen-Fløen on the Bergensbanen line.
Start date: 12/2015 - End date: 12/2016
Client: COWI AS
 

Cable survey; Oslo S Follobanen


Survey and registration of all cables on Oslo Central station relevant for the construction of the Follobanen line. Production of documentation of cable troughings and cable lists.
Start date: 08/2015 - End date: 06/2016
Client: ECT AS
 

Engineering and commissioning; signalling Ski station


In connection with building of new road bridge over the station area; as part of the Follobanen project; parts of the trackside signalling objects had to be moved. ProRail AS scope was to engineer the changes; engineer commissioning plan and do the function control and commissioning of the modified signalling system. Ski station is a border station on the Østfoldbanen line; separating the western part of the line and the eastern ERTMS-line. The work was done by personnel certified by Jernbaneverket as "Sluttkontrollør signal".
Start date: 01/2016 - End date: 06/2016
Client: NRC Rail AS
 

Quality control signalling; Engineering of Tøyen metro station Oslo


3. party quality control of signalling drawings for the modified metro station Tøyen in Oslo.
Start date: 02/2016 - End date: 04/2016
Client: ECT AS
 

Project Engineer; signalling UAB Arna-Bergen


Project Engineer on behalf of Jernbaneverket during engineering of the signalling system for the new double track section between Arna and Bergen on the Bergensbanen line. The work scope included both temporary signalling installations and the new class-B signalling system from Thales as part of the SignAn signalling frame agreement.
Start date: 03/2015 - End date: 01/2016
Client: Jernbaneverket Signaltjenester
 

Function control signalling; Koppang station


Function control of the modified level crossing and NSB-84 signalling systems at Koppang station on the Rørosbanen line.
Start date: 05/2015 - End date: 12/2015
Client: Baneservice AS
 

Function control signalling; Sarpsborg-Berg


Function control of the signalling systems of Østfoldbanen Sarpsborg-Berg; after rebuild due to planned ballast cleaning. The installation and commissioning was done in several phases. Scope of the rebuild included new cables; track fields and outdoor cabinets for Skjeberg; Ingedal and Berg stations and adjacent line block sections.
Start date: 05/2015 - End date: 01/2015
Client: Baneservice AS
 

Function control CTC Ofotbanen


Function control of NSI-63 relay interlockings during installation of new Centralized Train Control system for the Ofotbanen line. Included installation check-out and was done in several phases by personnel certified by Jernbaneverket as "Sluttkontrollør F".
Start date: 06/2014 - End date: 07/2015
Client: Jernbaneverket Signaltjenester
 

Signalling function control; Ski station


Planning; installation check out and function control of the modified signalling system at Ski station on the Østfoldbanen line. The function control was done as part of the commissioning of the reduced Ski station; enabling building of the Follobanen line. The work was done by personnel certified by Jernbaneverket as "Sikkerhetskontrollør signal" and "Sluttkontrollør signal".
Start date: 11/2014 - End date: 05/2015
Client: Baneservice AS
 

Installation of temporary signalling Sandnes-Stavanger


Site management; installation; installation check out and function control of temporary signalling installations as preparations for the commissioning of the new class-B signalling system on the double track section Sandnes-Stavanger on the Sørlandsbanen line. The work was done in two separate phases by personnel certified as "Sikkerhetskontrollør signal" and "Sluttkontrollør F" by Jernbaneverket.
Start date: 04/2015 - End date: 04/2015
Client: Infranord Norge AS
 

Quality control; signalling engineering Sandnes-Stavanger


Review and approval of drawings for the signalling system on the double track part between Sandnes and Stavanger on the Sørlandsbanen line.
Start date: 01/2015 - End date: 04/2015
Client: COWI AS
 

Installation Norwegian ERTMS Pilot line


Installation and installation check out services during the finalization of the installation of the new Bombardier Interflo 450 signalling system on the line Østfoldbanen Østre linje. The work was done by personnel certified as "Sikkerhetskontrollør signal" by Jernbaneverket.
Start date: 01/2015 - End date: 03/2015
Client: NJD AS
 

Site management signalling JBT-91 Ski station


First contract including signalling works for the Norwegian part of the Swedish company InfraNord AB after establishing business in Norway. As the company had no signalling personnel certified in Norway; ProRail AS was contracted for site management of the signalling part of the project; installation activities inside the technical building and installation check out and function control of the NSI-63 relay interlocking at Ski station on the Østfoldbanen line. The modifications of Ski station were done during several shutdowns and commissioning's. The project also included establishment of a new shunting area/ depot area for commuter trains starting and ending at Ski station.
Start date: 12/2012 - End date: 02/2015
Client: Infranord Norge AS
 

Signalling maintenance Oslo S; Drammensbanen and Spikkestadbanen


Condition control; testing; adjustment and correction of deviations in signalling systems of type NSB-94; NSI-63 and NSB-77 on parts of Oslo central station and the complete line Spikkestadbanen and Drammenbanen. The work was done by certified signalling personnel ("Sikkerhetskontrollør signal" and "Sluttkontrollør F").
Start date: 03/2012 - End date: 01/2015
Client: Jernbaneverket Bane Øst
 

Signalling function control; Østfoldbanen Østre linje


As preparations for the Norwegian ERTMS Pilot line project; 5 of the stations on the line was rebuilt to allow for centralized traffic control. The scope of work included complete function control of the 5 stations; including the old NSI relay interlocking and trackside objects. Several level crossing installations were also included in the scope; both legacy relay installations and interface towards new BUES-2000 installations. All work was done by personnel certified as "Sluttkontrollør F" by Jernbaneverket.
Start date: 07/2014 - End date: 12/2014
Client: Baneservice AS
 

Site manager electrical installations Lambertseterbanen


Call-of on our frame agreement with KTPAS. Technical site management during the rebuild of the metro line Lambertseterbanen. Production of tender documentation and negotiation with tenderers; technical follow up of contractors during installation; testing of the signalling system and production of maintenance documentation. Comprised all electrical systems on the metro line.
Start date: 03/2012 - End date: 11/2014
Client: Kollektivtransport-produksjon AS (KTPAS)
 

Quality control of signalling documentation for Oslo S


Quality control and update of app. 2.800 signalling drawings for the Oslo Central station central interlocking; including surrounding areas like Skøyen; Nationaltheateret; the Oslo tunnel; Lodalen and Loenga. A lot of construction work in the area during the last years; had produced several as-built versions of the documentation and scope of work was to achieve released ("FDV")-status on all documentation. Comprised both the NSB-77 relay interlocking and trackside objects. Also new relay tables and cross connection register for internal cables was made. The scope also included delivery of baseline documentation for ongoing projects.
Start date: 01/2011 - End date: 03/2014
Client: Jernbaneverket Bane Øst
 

Misc. Signalling function control


Function control of signalling objects for miscellaneous projects - Øyakrysset level crossing Larvik; FATC Drammen; Follobanen Oslo S.
Start date: 09/2011 - End date: 08/2013
Client: Jernbaneverket Utbygging
 

Site manager signalling Voss station


Site management on behalf of Jernbaneverket for modifications of the NSB-78 relay interlocking on Voss station on the line Bergensbanen. Also included function control of signalling objects during shutdowns.
Start date: 06/2012 - End date: 04/2013
Client: Jernbaneverket Utbygging
 

Banedata Rørosbanen


The Norwegian Rail Administration; Jernbaneverket; infrastructure database is called BaneData. The project scope was to register and update information for all signalling objects on the complete Rørosbanen and Solørbanen lines in the Banedata database. All of the stations and level crossings on the lines was inspected on site; as well as the on site documentation.
Start date: 05/2012 - End date: 02/2013
Client: Jernbaneverket Bane Nord
 

Signalling function control Movatn station


Function control of inside part of NSI-63 relay Interlocking at Movatn station on the Gjøvikbanen line. Part of the nationwide modifications of the ATC-system.
Start date: 02/2013 - End date: 02/2013
Client: Baneservice AS
 

Signalling function control Stjørdal station


Installation check out and function control of the modified NSI-63 relay interlocking on Stjørdal station at the Nordlandsbanen line.
Start date: 09/2012 - End date: 01/2012
Client: Leonhard Weiss Gmbh
 

Signalling Hjuksebø-Notodden; Tinnosbanen


Assistant Project Manager for signalling of the line Hjuksebø-Notodden. Included installation of Siemens axle counter system; FATC and reconfiguration of the NSI-63 relay interlocking installations for centralized traffic control. Hjuksebø-Notodden. Scope of work was follow up of installation contractor NJD AS; approval process towards "Statens Jernbanetilsyn"; risk analysis and the RAMS-process.
Start date: 03/2011 - End date: 09/2012
Client: Jernbaneverket Bane Øst
 

Replacement of signalling cables Oslo S


Planning; assistance during activities requiring certified signalling personnel; activities in technical rooms; function control for contractor without own signalling personnel for replacement of signalling cables and outdoor cabinets in the Oslo tunnel; part of NSB-77 relay interlocking for Oslo central station.
Start date: 11/2011 - End date: 07/2012
Client: Otera Samferdsel AS
 

Function control signalling Dilling-Fredrikstad.


Function control of the signalling systems of Østfoldbanen Dilling-Fredrikstad; after rebuild due to planned ballast cleaning. The installation and commissioning was done in several phases. Scope of the rebuild included new cables; track fields and outdoor cabinets for Dilling; Råde and Onsøy stations and adjacent line block sections. Also included function control of a point machine at Drammen station.
Start date: 04/2011 - End date: 06/2012
Client: El-Connection AS
 

Signalling function control Brattøra Trondheim station


Installation check out and function control of the NSI-63 relay interlocking for Trondheim station. The work was done by personnel certified by Jernbaneverket as "Sluttkontrollør F" during several phases of the project NAV Brattøra.
Start date: 01/2012 - End date: 05/2012
Client: Jernbaneverket Utbygging
 

Tønsberg-Barkåker; site management signalling


Jernbaneverket site manager for installation; test and commissioning of signalling installations for the new double track section of Vestfoldbanen - Tønsberg-Barkåker. Follow up of installation contractor NJD; follow up of JBV internal deliveries of engineering documents; test and commissioning.
Start date: 05/2011 - End date: 03/2012
Client: Jernbaneverket Utbygging
 

Tender for SignAn - class B signaling systems


SignAn was a tender for a frame agreement for delivery of class B signalling systems to Jernbaneverket. ProRail AS participated in the Bombardier Transportation bid team. Scope of work was roll out planning; selection of installation subcontractors and material planning for outdoor objects. The tender process resulted in a contract for Bombardier as the backup contractor for the winning tenderer. Bombardier also ended up delivering the FATC-system for the frame agreement.
Start date: 01/2012 - End date: 02/2012
Client: Bombardier Transportation AS
 

Tender for the Norwegian ERTMS-pilot Østfoldbanen Østre linje


Part of the winning Bombardier Transportation core bid team during the tender process and negotiations with Jernbaneverket for the Norwegian ERTMS-pilot. Main focus area for ProRail AS in the bid team was Project Management and planning/subcontracting of installation services.
Start date: 04/2011 - End date: 11/2011
Client: Bombardier Transportation AB
 

Training in engineering process and requirements


Training of Danish signalling personnel in Norwegian signalling engineering process and technical requirements for Norwegian engineering contracts towards Jernbaneverket.
Start date: 08/2011 - End date: 11/2011
Client: Atkins AS
 

Tender for the Danish ERTMS-program "Fjernbane"


Review of tender documentation for installation subcontractors and the roll out process. Part of Bombardier Transportation extended bid team during BAFO phase of the tender.
Start date: 07/2011 - End date: 09/2011
Client: Bombardier Transportation AB
 

Signalling function control after track works in the Oslo area


Function control by Jernbaneverket certified "Sluttkontrollør F" after track works like replacement of sleepers; insulated track joints and points.
Start date: 05/2011 - End date: 05/2011
Client: RailCom AS
 

Local control system for point operation on Majorstua station


Engineering of local control system for points in the shunting area of the KTPAS metro station Majorstua. Site management during installation and test of the system.
Start date: 11/2010 - End date: 02/2011
Client: RailCom AS
 

Site management/quality control metro Nationaltheateret-Majorstua


Site management and installation check out of signalling trackside objects during rebuild of the metro signalling system in the tunnel between Nationaltheateret and Majorstua stations.
Start date: 12/2010 - End date: 01/2011
Client: Baneservice AS
 

Site manager Drammen station signalling


Site management for the rebuild of the relay interlocking on Drammen station; enabling traffic of airport trains.
Start date: 01/2010 - End date: 01/2011
Client: Jernbaneverket Utbygging
 

Gevingåsen new signalling system


New tunnel "Gevingåsen" on Nordlandsbanen. Site management during test phase of the project. Test (function control) of the signalling system with Jernbaneverket certified "Sluttkontrollør F".
Start date: 01/2010 - End date: 12/2010
Client: Strukton Rail AS
 

Bid on signalling contract on Dovrebanen


Participation in the bid team for signalling contract on Dovrebanen. Clarifications of scope and production of material lists and bid documentation.
Start date: 11/2010 - End date: 11/2010
Client: Veidekke Entreprenør AS
 

Point machines Majorstua station


Adjustment and test of point machines on Majorstua metro station. Ebilock-850 interlocking / Ebiswitch and JEA-70 point machines.
Start date: 01/2010 - End date: 01/2010
Client: RailCom AS
 

Signalling function control Trondheim station


Function control with Jernbaneverket certified "Sluttkontrollør F" of new signals on Skansen moveable bridge on Trondheim station; Dovrebanen.
Start date: 01/2010 - End date: 01/2010
Client: Strukton Rail AS