Skip to content

Quality control of signalling documentation for Oslo S

Quality control of signalling documentation for Oslo S

Quality control and update of app. 2.800 signalling drawings for the Oslo Central station central interlocking; including surrounding areas like Skøyen; Nationaltheateret; the Oslo tunnel; Lodalen and Loenga. A lot of construction work in the area during the last years; had produced several as-built versions of the documentation and scope of work was to achieve released ("FDV")-status on all documentation. Comprised both the NSB-77 relay interlocking and trackside objects. Also new relay tables and cross connection register for internal cables was made. The scope also included delivery of baseline documentation for ongoing projects.


Start date: 2011-01 - End date: 2014-03
 Client: Jernbaneverket Bane Øst