Skip to content

Quality control; signalling engineering Sandnes-Stavanger

Quality control; signalling engineering Sandnes-Stavanger

Review and approval of drawings for the signalling system on the double track part between Sandnes and Stavanger on the Sørlandsbanen line.


Start date: 2015-01 - End date: 2015-04
 Client: COWI AS