Engineering of signalling system; Østensjøbanen metro line
Subcontract for engineering of the signalling system for rebuild of the Oslo metro line Østensjøbanen. Follow up of the installation phase and production of as-built and maintenance documentation for end client KTPAS.
Start date: 2014-06 - End date: 2017-02
Client: ECT AS