Feasibility study; Freight hub for the Trondheim area
The project was a feasibility study of possible adaptions of the NSI-63 relay interlocking on Trondheim station on the Dovrebanen line; for establishing a terminal which could serve as a freight hub for the entire region. Main focus area was necessary modifications of the signalling system for achieving 600m. train length. The conclusion was quickly found that no issues for the signalling system could be identified.
Start date: 2018-04 - End date: 2018-04
Client: Multiconsult AS