Site management/quality control metro Nationaltheateret-Majorstua
Site management and installation check out of signalling trackside objects during rebuild of the metro signalling system in the tunnel between Nationaltheateret and Majorstua stations.
Start date: 2010-12 - End date: 2011-01
Client: Baneservice AS