Installation of temporary signalling Sandnes-Stavanger
Site management; installation; installation check out and function control of temporary signalling installations as preparations for the commissioning of the new class-B signalling system on the double track section Sandnes-Stavanger on the Sørlandsbanen line. The work was done in two separate phases by personnel certified as "Sikkerhetskontrollør signal" and "Sluttkontrollør F" by Jernbaneverket.
Start date: 2015-04 - End date: 2015-04
Client: Infranord Norge AS