Test and commissioning of level crossing signals; Ganddal freigth terminal
The assignment scope was post installation check out; test and commissioning of level crossing signals for Orstad freight terminal. The installation work was done by other company in 2017. The activities were performed with personnel certified by Bane NOR as "Sikkerhetskontrollør signal" og "Sluttkontrollør F".
Start date: 2018-06 - End date: 2018-07
Client: Bane NOR SF